Hospitals

Stanford Modular Steam Plant and Lucille Packard Hospital Generators

Plan and speciļ¬cation fuel oil system built to furnish fuel to the modular steam plant for Hospital heat and for the LPCH generators. This project is unique in the application of a factory built modular steam plant that was built in an Arizona factory and re-assembled at the Stanford site. Fuel Oil Systems was hired […]

Van Ness and Geary Hospital

This 16 story OSHPD hospital is a fully BIM modeled, design-build fuel oil project to be completed in 2018. Diesel fuel is pumped from six protected class tanks in the basement to the three generators on level 13 and four boilers on level 12. A network of FOS brand PLC controllers is applied to simplify […]